Ferry Passenger terminal

Ferry Passenger terminal

Ferry Passenger terminal

ulag-geç  parom  ulag  ýolagçy  gämi-duralga       

           The passenger ferry terminal covers a total area of 230 thousand square meters, and four vessels with a deadweight of 5000DWT can be moored to its berth at the same time. Terminal will be able to serve 300,000 passengers and 75,000 trailers a year.

        The passenger terminal building with sparkling tinted glass and gold trim, with original architecture against the blue sky, appears to passengers in all its glory. The terminal is designed for 800 passengers. At the modern level, there is a system of migration and passport control, CIP and VIP waiting rooms equipped with the latest technology. There is also a hotel where traveling passengers and crews of ships that have docked at the port can relax. Also on the territory of the port there is a picturesque park for walking and recreation, shopping and entertainment centers, including a billiard room, a children’s room, internet cafes, bars and restaurants.

 

Time spent on loading and unloading operations (full operation) in stable weather conditions.

       Passenger ferry terminal:

* Unloading of vehicle from ferry – 6,5 minutes

Note: The time at which disinfection is performed.

* Loading of vehicle to ferry – 6,5 minutes

 

      

      

Bularada serediň


     The oil loading terminals of the Turkmen...

Dowamy...

Vessels of the Port auxiliary fleet:    ...

Dowamy...

      One of the important production facilit...

Dowamy...

             O...

Dowamy...

             A...

Dowamy...

             T...

Dowamy...
Icon